Eyes on Main Street - May 6, 2014
MnDOT and Engineers Walk Main Street
A walk through was done the entire length of the project with MnDOT, engineer, and city staff on August 28th. Several sidewalks will be replaced. There was a recommendation by Mayor Poole to fill in the tree bed on the east side of Ivy Grove, and motion passed. A drain is being inserted by the "pond" at The Corner. Also the curb will be extended on the west side of town to Grinde's driveway. The falled down section of the wall at the school will be rebuilt. The question was asked about the circle between the Legion and Wilmington Insurance: Mayor Poole said the benches will be installed, trees, plants, and boulders. The estimate is that at least a month of construction is left before the final aesthetics (including benches, waste receptacles, trees, sod) will be added.
Spring Grove received the Community Roadside Landscape Program grant and is working with Scott Pass, Environmental Coordinator Assistant for MnDOT District Six in Rochester. This program is a community program and will need the help of community volunteers for the installation of the shrubs, perennials and applying bark mulch. This year only a few planters will be planted with these funds, with plans to apply each year to plant more. Watch for more details. If you are interested in volunteering contact city hall.
Angled parking will be painted on Maple Drive prior to Syttende Mai.
Tuesday, May 6, 2014
Thursday, November 21, 2013
Ribbon Cutting Event
Eyes on Main Street - November 21, 2013
Ribbon Cutting Event
What a spectacular site today! Watching the Legion Colorguard march down the street and seeing all the students walk towards us. It was an unforgettable day! Watch KTTC News tonight at 6 and 10 for a recap. It was so great for them to come and celebrate our day. Here are some photos from today, more recap later.
Ribbon Cutting Event
What a spectacular site today! Watching the Legion Colorguard march down the street and seeing all the students walk towards us. It was an unforgettable day! Watch KTTC News tonight at 6 and 10 for a recap. It was so great for them to come and celebrate our day. Here are some photos from today, more recap later.
| Palmer Ovestrud was 9 when the road was paved in the 30s! |
| Marlene taking a group photo! |
| Ribbon is cut by Nicki Ellingson, Student Council President, and Mayor Bruce Poole cut ribbon. |
| Detour signs are picked up! |
| Road opens. |
Wednesday, November 20, 2013
News on the Street
Eyes on Main Street - Today's Date
News on the Street
Steve Pierce, Mathy Onsite Manager, said the street will be open Thursday afternoon. Hope to see many of you at the Ribbon Cutting tomorrow. Remember what the street used to look like? Check back tomorrow for updated photos of final.
News on the Street
Steve Pierce, Mathy Onsite Manager, said the street will be open Thursday afternoon. Hope to see many of you at the Ribbon Cutting tomorrow. Remember what the street used to look like? Check back tomorrow for updated photos of final.
Preschool Watches, Final Touches, and Highway 44 Opens
Eyes on Main Street - November 20, 2013
Preschool Watches, Final Touches, and Highway 44 Opens
Walking along Main Street last night was so exciting - seeing the new lights, the finished road, the smooth sidewalks, and more. I can't wait until spring when the landscaping begins to make downtown even more beautiful. I noticed one of the new snowflakes for the street lights was up and the festive mood is starting. I hope many of you are able to make it to the ribbon cutting tomorrow - a great event for our town that will bring the generations together by including all the students from Spring Grove Public School. The ribbon will be cut by Student Council President Nicki Ellingson and Mayor Bruce Poole.
Check out the great photos below - some are from Monday November 18 taken by Spring Grove Communications and some are from Tuesday November 19 taken by Giants of the Earth showing the preschool students watching the final layer. Pictures are at the end of this page.
The following just came from MnDOT.
Here are some photos of the final layer of asphalt.
These are from Monday.
These are from Tuesday.
Preschool Watches, Final Touches, and Highway 44 Opens
Walking along Main Street last night was so exciting - seeing the new lights, the finished road, the smooth sidewalks, and more. I can't wait until spring when the landscaping begins to make downtown even more beautiful. I noticed one of the new snowflakes for the street lights was up and the festive mood is starting. I hope many of you are able to make it to the ribbon cutting tomorrow - a great event for our town that will bring the generations together by including all the students from Spring Grove Public School. The ribbon will be cut by Student Council President Nicki Ellingson and Mayor Bruce Poole.
Check out the great photos below - some are from Monday November 18 taken by Spring Grove Communications and some are from Tuesday November 19 taken by Giants of the Earth showing the preschool students watching the final layer. Pictures are at the end of this page.
The following just came from MnDOT.
Highway 44 in Spring Grove opens to trafficRibbon cutting ceremony scheduled
ROCHESTER, Minn. – Highway 44 through downtown Spring Grove will open to traffic in the evening Friday, Nov. 22, according to the Minnesota Department of Transportation.
Highway 44 had been closed since June for a reconstruction project. To celebrate the completion of the reconstruction project, the city of Spring Grove has scheduled a ribbon cutting ceremony for Thursday, Nov. 21 at 1:30 p.m. Community members are invited to meet outside Ivy Grove, 101 West Main Street, and walk the new street to the 1st Avenue Northwest intersection.
MnDOT urges motorists to always drive with caution, slow down in work zones and never enter a road blocked with barriers or cones
Here are some photos of the final layer of asphalt.
These are from Monday.
![]() |
| Photo by Karen Fried |
These are from Tuesday.
Monday, November 18, 2013
Main Street Ribbon Cutting
Eyes on Main Street - November 18, 2013
Main Street Ribbon Cutting this Thursday
Main Street is expected to be open either Thursday night or Friday morning, and you are all invited to the celebration hosted by the Spring Grove School and Commercial Club this Thursday. School children, teens, teachers and anyone else who wants to walk from the west side will leave school at 1:30 this Thursday, November 21. Anyone who wants to walk from the East side will meet in front of Ivy Grove/Legion at 1:30 and will walk towards the ribbon placed by the Opera House. What a great event for our town! Please help spread the word to everyone in the Spring Grove area! Remember you can also watch it on the Spring Grove Communications web cam.
Here are some photos from today.
Main Street Ribbon Cutting this Thursday
Main Street is expected to be open either Thursday night or Friday morning, and you are all invited to the celebration hosted by the Spring Grove School and Commercial Club this Thursday. School children, teens, teachers and anyone else who wants to walk from the west side will leave school at 1:30 this Thursday, November 21. Anyone who wants to walk from the East side will meet in front of Ivy Grove/Legion at 1:30 and will walk towards the ribbon placed by the Opera House. What a great event for our town! Please help spread the word to everyone in the Spring Grove area! Remember you can also watch it on the Spring Grove Communications web cam.
Here are some photos from today.
Friday, November 15, 2013
Entering the Final Stages and MnDOT Update
Eyes on Main Street - November 15, 2013
Entering the Final Stages and MnDOT Update
Entering the Final Stages and MnDOT Update
The word on Main Street last night was that the final layer was going to begin today. When I left for work this morning, it hadn't started, but they hoped to finish it by tomorrow. Next week will be some final touches as seen in the update from MnDOT below. Watch for details on a grand opening celebration possibly next week!
Here is the update from Jeffrey Bunch - Project Engineer from MnDOT District 6-Winona.
As a reminder, Highway 44 in downtown Spring Grove
is still closed to traffic. There are people sneaking through barricades
and driving through downtown. Please remind your friends and neighbors
that they need to continue to use the local
detour to get around downtown.
This week in Spring Grove:
- Finishing up sidewalk and Ped ramps East of Division Ave.
- Spreading topsoil from Division Ave to the east.
- Installing light poles from Division Ave. to the east
Next week in Spring Grove:
- Installing new street signs.
- Finishing up installing light poles east of Division Ave.
- Spreading topsoil and placing sod.
- Paving final surface lift of bituminous pavement.
Highway 44 from Spring Grove to Highway 52:
- Finished paving final surface lift of bituminous pavement from Spring Grove to Highway 52.
- Placing aggregate shoulders between Underpass Quarry and Highway 52. Working from the Quarry to the east next week.
- Installing edge line rumble strips from the west end of Spring Grove to Highway 52 next week.
- Placing temporary paint striping along entire project next week.
- Flaggers and pilot car will continue to control Highway 44 single lane traffic.
Friday, November 8, 2013
MnDOT Weekly Update
Eyes on Main Street - November 8, 2013
MnDOT Weekly Update
MnDOT Weekly Update
As a reminder, Highway 44 in downtown Spring Grove
is still closed to traffic. Please remind your friends and neighbors
that they need to continue to use the local detour to get around
downtown.
This week in Spring Grove:
- Pouring sidewalk and Ped ramps East of Division Ave.
- Placing sod from 1st Ave NW to 3rd Ave NW
- Installing light poles from Division Ave. to the east
- Pouring sidewalks and Ped ramps east of Division Ave.
- Installing light poles east of Division Ave.
- Spreading topsoil and placing sod.
- Paving final surface lift of bituminous pavement (keep your fingers crossed for good weather).
- Paving final surface lift of bituminous pavement from Underpass Quarry to Highway 44/Highway 52 intersection. When crews reach Highway 52 they will return to Underpass Quarry and begin paving east toward Spring Grove.
- Replacing substandard mailbox supports along Highway 44.
- Flaggers and pilot car will continue to control Highway 44 single lane traffic.
Subscribe to:
Posts (Atom)






























